Every building is measured from the same line.
Display, Archivo at 62% width, 500
Raise the frame.
Text, Schibsted Grotesk 400
Columns and slabs are cast in place, one floor at a time, with the crane and the deliveries planned around each pour.
Level, metres from the datum
Top of frame+21.60
- Basalt#0D1210
- Carbon#1B201D
- Formwork#123327
- Worklight#8FE3B0
- Limestone#E4E0D6
- Paper#ECE9E1
- Concrete#A9A79E
- Ink#151A17
Buttons
A body and a key, joined like formwork. Hover opens the chamfer and slides the key one module; pressing closes the joint.
Primary, large
Primary
Ghost
Fields
A raised surface on a rule. Focus pulls a chamfer into the corner and lights the rule; a fault points at the field and says what to change.
Text
Select
With a unit
Fault
Set later
Long text
Selection
Radios are level markers. Checkboxes take a chamfered block, the switch a key that travels and fills.
Segmented
Checkboxes and switch
Phase switch
The system's own switch. Day one is the site at night under the work light; handover is limestone in daylight. Pictures that share a camera swap frames, and copy written for one phase gives way to the other.
Tabs and tables
Tabs stand on the datum and the chosen one rises a step. Arrow keys move between them. Levels are written the way a surveyor writes them.
- Formation level
- −4.20
- Sheet piles
- 186 m
- Raft
- 1.2 m thick
- Top of frame
- +21.60
- Floor cycle
- 9 days
- Storeys
- 6
- Envelope
- 320 panels
- Roof garden
- +24.00
- Handover
- Week 61
Schedule table
| Stage | Starts | Weeks | Level | Status |
|---|---|---|---|---|
| Setting out and shoring | 3 March 2025 | 4 | ±0.00 | Done |
| Excavation and raft | 31 March 2025 | 10 | −4.20 | Done |
| Frame, ground to roof | 9 June 2025 | 20 | +21.60 | On site |
| Envelope | 27 October 2025 | 16 | +24.00 | Planned |
| Finishes and handover | 16 February 2026 | 10 | ±0.00 | Planned |
Project index
Status and progress
On site uses the work light. Caution and fault are lamps, not decoration; progress is drawn as footings and a pour.
Status tags
Pour meter
Footing steps
- SurveyDone
- PlanDone
- BuildWeek 34
- Hand overWeek 61
Alerts
Road closure
Mill Lane is closed from 6 to 9 June
The mobile crane lifts the roof plant. Walk along the river path instead; it stays open.
Stopped
The tower crane is stood down for wind
Gusts above 45 km/h. Deliveries for today move to tomorrow morning.
Loader
Level−4.20
Cards and plates
A card is a framed photograph and its caption, not a box. Linked cards open the steel angles one module. A phase plate keeps one camera across two dates.
Site camera 2
One camera, two dates.
Flip the phase. The handover frame wipes across the day-one frame from the left, the way the building closed in.
Survey pins
The old quay was surveyed, repaired and kept. It now carries the riverside walk.
A double-height ground floor opens onto the walk, where the casting shed once stood.
Columns and slabs cast in place, six storeys, left visible on every facade.
Dialogs and toasts
Dialogs are native, with two chamfers, and return focus where it came from. A toast's time drains through four footings; hovering holds it.
Try them
Toast
Enquiry sent
A project manager replies within two working days.
Dialog
Enquiry
Tell us about your site.
A plot, a brief or only a question. A project manager replies within two working days.
Navigation
The bar steps aside while you read down and returns on any scroll up. Chapters live on a level staff; on phones, in a bar at the bottom that opens the menu.
Bar with brand, links and action
Level staff
Phones: chapter bar
The staff marks the chapter you are in and reads its level. Choose a mark to see the readout change.