InfallDesign system 1.0

Colour lives only in the energy. Ignite the core: the charge turns solar and the bands close in on their centre line.

A ribbon of amber particles falling from both edges into a white core

Display, Kumbh Sans 400

Energy falls inward.

Text, Kumbh Sans 400 and 500

Each shot begins at the edge. Converging fields carry the plasma toward the centre, faster with every turn, until it meets itself and fuses.

Telemetry, tabular figures

Inflow
2.41PW
Core
148.6MK
Shot
0413

Ink

#000000

Edge

#61605E

Dim

#8D8C89

Paper

#F3F1EC

Hot

#FFF0CC

Amber

#FF8F29

Ember

#EB380D

Deep

#4D0D03

The core at full charge, a white point with strands burning into it
CoreThe white point up close, where the strands meet. Cards, figures and details.
One arm of amber strands crossing the frame toward a core on the left
InflowAn arm of the ribbon crossing the frame. Wide plates and scenes behind type.
A dark field crossed by faint rays, the ribbon high in the frame
AfterglowBlack field, dust and rays, the energy pushed to an edge. Opens or closes a page.

Core monitor, live

Meter and charge

Grid availability82 %
Output240MW

Banded figures

400 MW

Core 01 liveFuel below 20 %

Buttons

The main action charges: its five cells fill one after another. The line button closes in from both edges, the way the energy falls.

Charge, the main action

Line

Hold to charge

Sizes: 24, 38 and 48 px

Icon only

Working, and links

Fields

A box on an edge line. On focus the label becomes the white bar; a fault says what to change.

Text

Select

With a unit

Fault

Assigned later

Long text

Selection

The white bar travels to the choice. Radios are cores: a ring with a point that lights. The charge slider fills cell by cell.

Segmented

Connection

Checkboxes and switch

Charge slider

Peak demand320MW

The system's own switch

Cold draws every charge in paper. Ignited turns it solar and lights the core.

Tabs and data

Arrow keys move between tabs. Figures are tabular and carry their units; the trace stacks cells, like the charge.

Tabs

Shots fired
0413
Longest burn
9.4s
Peak core
148.6MK
To the grid
400MW

Shot table

The last five shots at Core 01
ShotDateBurnPeak coreTo gridStatus
041314 Oct, 06:129.4 s148.6 MK400 MWFull power
041213 Oct, 06:089.1 s147.9 MK400 MWFull power
041112 Oct, 18:403.2 s131.0 MK140 MWHeld short
041012 Oct, 06:050.4 s62.3 MK0 MWAborted
040911 Oct, 06:118.8 s146.2 MK400 MWFull power

Inflow trace, last 14 shots

04000413

Telemetry

Core 01 / live

T+ 00:00:00.00

43.53 N / 5.08 E

Implosion fusion

Est. 2024

Counters

Homes on the grid
310,000
Carbon avoided
1.9Mt a year

Status and progress

Amber and ember are energy readings: caution and fault. Nominal stays paper, and the live point only burns once the system is ignited.

Tags

Core 01 liveFull powerHeld shortAbortedIn service

Meters

Field strength96 %
Fuel reserve18 %

Live point and loader

  Core 01 is firing

Core 01 / charging000

Alerts

Shots pause from 2 to 9 November

The annual field-coil service. The log resumes with shot 0441 on 10 November.

Steps of a shot

  1. ChargeCapacitors full
  2. CompressFields converge
  3. IgniteFuel meets itself
  4. ReleaseHeat to the grid

Plates and figures

Figures are images with a caption, not boxes. A linked figure takes the white bar on its title. Plates run edge to edge with type on the dark side.

The ribbon entering from both edges into the core at the centre

Core 01, shot 0413

A 9.4-second burn at 148.6 million kelvin.

Wordmark

Banded type, any word

0413

Band rule

Seven hairlines that close in on the centre line when the core ignites.

Dialogs and toasts

A dialog opens on a white bar. A toast's time drains from both ends into its centre; hover pauses it.

Try them

Toast

Core reserved

Our siting team replies within two working days.

Dialog

Before the shot0414

Fire a test shot?

The capacitors charge for 40 s and the core fires once.

Before the shot

Fire a test shot?

The capacitors charge for 40 s and the core fires once. The shot is logged as a test and never reaches the grid.

Navigation

Every item sits on a column. The current page is the white bar. Below 1024 px the rest move into a full-screen menu; switch the width to try it.

Bar, plate and telemetry row

Grid 400 MW

Inflow 2.41 PW

Core 148.6 MK

Shot 0413

Next 06:10

Infall / Shot log
Reserve a core