Colour lives only in the energy. Ignite the core: the charge turns solar and the bands close in on their centre line.
Display, Kumbh Sans 400
Energy falls inward.
Text, Kumbh Sans 400 and 500
Each shot begins at the edge. Converging fields carry the plasma toward the centre, faster with every turn, until it meets itself and fuses.
Telemetry, tabular figures
- Inflow
- 2.41PW
- Core
- 148.6MK
- Shot
- 0413
Ink
#000000
Edge
#61605E
Dim
#8D8C89
Paper
#F3F1EC
Hot
#FFF0CC
Amber
#FF8F29
Ember
#EB380D
Deep
#4D0D03
Core monitor, live
Meter and charge
Banded figures
400 MW
Buttons
The main action charges: its five cells fill one after another. The line button closes in from both edges, the way the energy falls.
Charge, the main action
Line
Hold to charge
Fields
A box on an edge line. On focus the label becomes the white bar; a fault says what to change.
Text
Select
With a unit
Fault
Assigned later
Long text
Selection
The white bar travels to the choice. Radios are cores: a ring with a point that lights. The charge slider fills cell by cell.
Segmented
Checkboxes and switch
Charge slider
The system's own switch
Cold draws every charge in paper. Ignited turns it solar and lights the core.
Tabs and data
Arrow keys move between tabs. Figures are tabular and carry their units; the trace stacks cells, like the charge.
Tabs
- Shots fired
- 0413
- Longest burn
- 9.4s
- Peak core
- 148.6MK
- To the grid
- 400MW
- Shots fired
- 0000
- Construction
- 62%
- First plasma
- Q2 2027
- Planned
- 400MW
- Shots fired
- 2108
- Longest burn
- 1.2s
- Peak core
- 96.0MK
- To the grid
- None
Shot table
| Shot | Date | Burn | Peak core | To grid | Status |
|---|---|---|---|---|---|
| 0413 | 14 Oct, 06:12 | 9.4 s | 148.6 MK | 400 MW | Full power |
| 0412 | 13 Oct, 06:08 | 9.1 s | 147.9 MK | 400 MW | Full power |
| 0411 | 12 Oct, 18:40 | 3.2 s | 131.0 MK | 140 MW | Held short |
| 0410 | 12 Oct, 06:05 | 0.4 s | 62.3 MK | 0 MW | Aborted |
| 0409 | 11 Oct, 06:11 | 8.8 s | 146.2 MK | 400 MW | Full power |
Inflow trace, last 14 shots
Telemetry
Core 01 / live
T+ 00:00:00.00
43.53 N / 5.08 E
Implosion fusion
Est. 2024
Counters
- Homes on the grid
- 310,000
- Carbon avoided
- 1.9Mt a year
Status and progress
Amber and ember are energy readings: caution and fault. Nominal stays paper, and the live point only burns once the system is ignited.
Tags
Meters
Live point and loader
Core 01 is firing
Alerts
Shots pause from 2 to 9 November
The annual field-coil service. The log resumes with shot 0441 on 10 November.
Shot 0410 aborted at 0.4 s
A coil drifted out of tolerance. The core vented safely and fired again at 18:40.
Read the reportSteps of a shot
- ChargeCapacitors full
- CompressFields converge
- IgniteFuel meets itself
- ReleaseHeat to the grid
Plates and figures
Figures are images with a caption, not boxes. A linked figure takes the white bar on its title. Plates run edge to edge with type on the dark side.
Core 01, shot 0413
A 9.4-second burn at 148.6 million kelvin.
Wordmark
Banded type, any word
0413
Band rule
Seven hairlines that close in on the centre line when the core ignites.
Dialogs and toasts
A dialog opens on a white bar. A toast's time drains from both ends into its centre; hover pauses it.
Try them
Toast
Core reserved
Our siting team replies within two working days.
Dialog
Fire a test shot?
The capacitors charge for 40 s and the core fires once.
Navigation
Every item sits on a column. The current page is the white bar. Below 1024 px the rest move into a full-screen menu; switch the width to try it.
Bar, plate and telemetry row